The core business is service and maintenance of mechanical building services including controls and energy management installations.
County Heating, who are the preferred contractor for Cornwall County Council, were employed to install the new system. Mark Mingo, Director of County Heating, comments "We really like the new Zenex system because it was easy to install, feed up valuable space in the plant room and with the addition of hte Zenex GasSaver on the condensing Baxi boilers gives a real energy efficiency improvement. Mark commented that the technical support from Zenex had been superb and helped with addressing technical issues which meant there was no delay in installation.
Click here to download the full project PDF
Client: Cornwall County Council
To fit in with Fifteen sustainable thinking County Heating were proud to provide eco friendly high-efficiency Clyde wall-hung boilers, one with an output of 58 kW and the other 77 kW boilers being fitted with pre-mix modulating burners.
Hot water is stored in two Clyde SU calorifiers being linked to an energy-recovery system that extracts heat from the kitchen ventilation system to provide 25 to 30% of the energy needed for water heating.
Client: Fifteen
Designed by: County Heating Maintenance Ltd
Renewal of main boiler plant with 3 new gas fired Stokvis boilers and flue systems serving existing zones but with new pump sets, Hoval calorfiers and a new stored water boosted installation.
Provision of new BMS system and in-house build control panel, all installation work undertaken and completed without disruption to the normal operation of the Leisure Centre.
Client: Caradon District Council
Designed by: GPJ Consulting Engineers Ltd
Replace obsolete boiler plant during 2004 summer holidays with installation of 3 new Ferroli gas fired boilers, new flue system, Broag calorfiers, and new BMS control panel and associated wiring.
Client: Cornwall County Council
Designed by: The Design and Maintenance Consultancy
Replace obsolete boiler plant with 3 new gas fired Clyde boilers to service the heating installation, together with an Andrews hot water generator to satisfy the hot water service demand.
Installation of new flues and modifications to the BMS (Building Management System) together with new lighting and decoration completed the project on time for the new school year.
Client: Cornwall County Council
Designed by: The Design and Maintenance Consultancy
Complete refurbishment of historic hotel included heating, water services, gas installation, ventilation, plumbing and sanitation.
Design and Build installation with short programme to ensure successful completion by Easter 2003.
The Hotel is convenient to the Eden Project.
Client: St Austell Brewery
Designed by: County Heating Maintenance Ltd
Replacement of boiler plant with new Strebel combination boiler and pressurisation unit, rewire plant with new control panel.
Temporary services maintained to home during installation which was pre-planned to complete in shortest possible time.
Client: Cornwall Care Ltd
Designed by: Dodd Cummings and Love
Replacement of boiler plant including rewiring and install a new control panel and building management system.
Summer installation completed ready for the 2003/2004 heating season.
Client: Cornwall County Council
Designed by: The Design and Maintenance Consultancy
New Hoval boiler plant with heat exchangers to replace equipment past useful life cycle.
Phased installation and out of hours working in order to maintain hotel services through busy summer holiday season.
Client: Falmouth Hotel
Designed by: County Heating Maintenance Ltd